Et link til indstilling af din adgangskode er sendt til: For at få adgang til dine køb i fremtiden har du brug for en adgangskode.
Få 3 videoer eller 25 billeder med en gratis prøveversion
Få 3 videoer eller 25 billeder med en gratis prøveversion
Nye filtre tilføjet
Sortér efter

2.175 resultater for bim model i videoer

Visualization of the concept of BIM model utilities of the building
00:50
HD
Asian man Civil Engineer or Architect and Contractor working use BIM (building information modeling) technology Augmented Reality on digital tablet at construction site.
00:08
HD
BIM model of a large steel industrial building for presentation to the customer from the design organization. Flight of the structural model of the building. 3D rendering.
00:20
HD
digital construction building information modeling bim concept with 3d model and blueprints illustration. The building is surrounded by a fence
00:10
HD
3d animation zooming into wire frame model
00:10
HD
Site Manager Reviews Digital Holographic Visualization Of Construction Blueprint And Equipment Placement
00:10
HD
Building information modeling system analyzing steel frame construction progress with data collecting and processing during building process, increasing efficiency and productivity
00:05
HD
Mechanical Engineer Uses 3D Software
00:16
HD
Architecture design software: creating building models with cad and bim technology
00:08
HD
Building information modeling (BIM) words tag cloud text animation
00:18
HD
Digital construction modeling showing intricate building systems, including hvac ducting, plumbing, and electrical conduits, for efficient engineering and project management
00:05
HD
Professional architects analyze a 3d model of a building structure, engaging in a collaborative discussion during a meeting in a modern office
00:06
HD
269Detailed BIM 3D model illustration of ventilation ducts, vector-style rendering highlighting connections, bends, and airflow network for architectural and engineering planning
00:10
HD
The quality manager engineer checks the constructed metalwork object for compliance with the 3D model in the tablet.
00:14
HD
Bim building information modeling concept with digital shield and network animation
00:10
HD
 Architect Wearing a VR Headset Stands in Office Shell as Immersive Overlay Graphics Transform It Into Office Workplace, Visualising Design, Digital Space Planning, and Virtual Interior Configuration
00:11
HD
Ultra HD 4K Architect interacting with a holographic 3d model of a modern building on a digital interface, representing smart construction, bim technology, and future urban planning cinematic video
00:10
HD
Detailed 3D model of a building under construction with wireframe overlay, showing internal structure, MEP systems, and a crane.  Perfect for construction, architecture, and engineering projects.
00:05
HD
Architect manipulating a glowing 3d building model through augmented reality, visualizing innovative design processes in a futuristic architectural setting
00:10
HD
Top view visualization of a BIM model of utilites of building with transparent walls
00:40
HD
Building construction site with bim digital wireframe overlay. Architecture visualization, engineering design and modeling technology with structural blueprint and project management.
00:09
HD
Animation of a BIM model of a building structure made of metal structures made by structural engineers. 3D design project.
00:10
HD
digital construction building information modeling bim concept with 3d model and blueprints illustration. Large white house with a long white roll of paper on the ground
00:10
HD
Asian female people talking to each other before BIM model in virtual world
00:06
HD
Engineer Using 3D LiDAR Laser Scanner for Industrial Site Survey
00:10
HD
Visionary Blueprint: A construction worker wearing VR goggles interacts with a holographic blueprint in a modern factory, symbolizing innovation and technological advancement in the building industry.
00:05
HD
Two Engineers Using 3D BIM Software
00:22
HD
Building information modeling bim concept infographic with animated digital hud interface connected for construction management, architectural engineering, project planning, and smart infrastructure
00:12
HD
Building information modeling (BIM) words tag cloud blue text animation video
00:18
HD
Holographic blueprints overlaying a bustling construction site in a modern city, showcasing innovative architectural planning and urban development
00:05
HD
Construction Engineer team uses tablets to check details of work and record data while inspecting construction work, Inspecting progress of work for planning and management.
00:17
HD
Professional engineers in safety gear interacting with 3d building model on touchscreen, highlighting cutting edge technology in architectural design and construction industry
00:06
HD
270Detailed BIM 3D model illustration of ventilation ducts, vector-style rendering highlighting connections, bends, and airflow network for architectural and engineering planning
00:10
HD
The quality manager engineer checks the constructed metalwork object for compliance with the 3D model in the tablet.
00:12
HD
Construction Engineers Walk to a High Rise While Augmented Reality Light Lines Graphics Build the Structure, Projecting Digital Building Data, Smart Architecture, Modern Construction Digitalization
00:11
HD
Aerial flight rise above the metal frames of the building under construction. Metal piles streak in the shot. Taken by drone
00:22
HD
Cutting-Edge Digital Building Information Modeling (BIM) Technology in Modern Architecture and Engineering Visualization for Efficient Project Planning
00:10
HD
Professional construction engineer wearing ar goggles and hardhat visualizing 3d building model at construction site, demonstrating advanced technology integration
00:05
HD
Visualization of a BIM model of utilites office building with transparent walls
00:30
HD
An architect brings architectural designs to life with 3D holographic construction models. The concept of innovation in architecture and futuristic design. Generative Ai.
00:09
HD
Presentation of 3D BIM modeling of buildings made of metal structures for presentation to the General contractor, subcontractors and construction customer. 3D rendering.
00:20
HD
digital construction building information modeling bim concept with 3d model and blueprints illustration. The building is surrounded by other buildings and a few cars. The image has a modern
00:10
HD
one Asian female acting 3 roles as engineer & designer studying virtual architecture model talking to each other
00:09
HD
Building information modeling concept with bim icon and related icons on digital background, representing the use of technology in construction and architecture
00:10
HD
Traditional house with garden and pool
00:19
HD
Engineer Carefully Analyzes 3D Digital Twin Mapping
00:16
HD
Furnishing items are virtually arranged in an empty room and make up a living room with armchairs and sofas, building information modeling, BIM, 3d rendering, 3d illustration
00:15
HD
Futuristic buildings appearing over a miniature city model
00:05
HD
Architects and engineers are using a futuristic holographic bim software to visualize a 3d model of a building on a construction site at night, improving planning and collaboration
00:05
HD
Construction Engineer uses tablets to check details of work and record data while inspecting construction work, Inspecting progress of work for planning and management.
00:11
HD
Engineer examines a tablet showing an ARenhanced BIM model with hidden HVAC ductwork mapped out facilitating accurate alignment during a renovation project.
00:06
HD
265Modern 3D vector blueprint of HVAC air ducts, detailed junctions, vents, and pipelines, BIM model style emphasizing precision for architectural planning
00:10
HD
Virtual reality futuristic design technology. Architect or design engineer in VR headset for BIM technology designing a 3D model
00:10
HD
Building Information Modeling words animated with cubes
00:33
HD
Engineer and Engineer Walk Through a Construction Interior While Augmented Reality Graphics Show Hvac Paths, Mep Systems, Bim Layers, and Digital Twin Data, Immersive Smart Building
00:11
HD
Architect Asian woman with teamwork present idea design modern house model together with renewable energy friendly is environmental in smart home concept.
00:09
HD
3D BIM model of reinforcement framework displaying structural engineering and detailed construction elements
00:05
HD
Architect Engineer Using Virtual Reality Software for His Project. Man with Headset and Controllers wearing VR headset for working design 3D architectural building model with BIM technology and
00:13
HD
Conceptual visualization of the BIM model utilities of the building
00:52
HD
An architect brings architectural designs to life with 3D holographic construction models. The concept of innovation in architecture and futuristic design. Generative Ai.
00:07
HD
Flying over the top of a BIM model of an industrial building made of metal structures made by structural engineers. Development of detailed drawings of metal structures.
00:10
HD
digital construction building information modeling bim concept with 3d model and blueprints illustration
00:10
HD
Asian female engineer using BIM model in virtual world
00:06
HD
The quality manager engineer checks the constructed metalwork object for compliance with the 3D model in the tablet.
00:12
HD
Traditional house with veranda and  garage
00:25
HD
Engineer Using BIM And GIS Software
00:36
HD
Furnishing items are virtually arranged in an empty room and make up a living room with armchairs and sofas, building information modeling, BIM, 3d rendering, 3d illustration
00:14
HD
Professional architect wearing advanced vr headset, interacting with immersive 3d building model projection in augmented reality visualization at modern office workspace
00:09
HD
Building information modeling system managing construction project of modern skyscraper with structural design and architectural bim model integrating engineering and construction workflows
00:05
HD
BIM specialists collaborating around holographic 4D building model with timeline visualization using gesture controls and digital twin technology to optimize construction
00:10
HD
Construction engineer using a tablet showing an interactive 3d model of a building, changing the structural elements and adding details in augmented reality
00:07
HD
Engineers Using Augmented Reality for Construction Planning Generative AI
00:10
HD
Virtual reality futuristic design technology. Architect or design engineer in VR headset for BIM technology designing a 3D model
00:10
HD
Building Information Modeling- businessman working with virtual reality at office.
00:29
HD
Three Construction Specialists, Rising Office Building, Augmented Reality Lines and Vfx Graphics Reveal the Finished Facade, Digital Twin Visualization,  Data Driven Smart Building Construction
00:11
HD
Professional engineer, wearing a safety helmet and reflective vest, inspects a busy construction site, taking notes with a notepad for thorough documentation to ensure everything is in order
00:13
HD
Building the Future, One Blueprint at a Time: Engineers collaborate on a futuristic construction project, using AR to visualize a holographic building model, embodying innovation in modern architectur
00:05
HD
Architect Engineer Using Virtual Reality Software for His Project. Man with Headset and Controllers wearing VR headset for working design 3D architectural building model with BIM technology and
00:09
HD
Top view 3D BIM model of the floor plan of a building with utilities
00:24
HD
An architect brings architectural designs to life with 3D holographic construction models. The concept of innovation in architecture and futuristic design. Generative Ai.
00:08
HD
Animation of a BIM model of a building structure made of metal structures made by structural engineers. 3D design project.
00:10
HD
digital construction building information modeling bim concept with 3d model and blueprints illustration
00:10
HD
one Asian woman acting 2 roles as engineer & designer discussing before BIM model in virtual world
00:08
HD
Beautiful animated hologram of Reinforced Concrete model support system
3D rendering  Construction BIM
Cyber GUI element for digital technology concept .
HUD element made of particles.
00:10
HD
Traditional house with veranda and  garage
00:13
HD
Building 3D Design Concept Using Digital Technology
00:22
HD
Building Information Modeling. IT Administrator Activating Modern Data Center Server with Hologram.
00:31
HD
Futuristic city utilizing smart building technology showcasing energy consumption and efficiency data visualization. Promoting sustainable urban development and intelligent infrastructure management
00:10
HD
Aerial view of a futuristic cityscape at night, featuring hologram building models superimposed over real buildings under construction, symbolizing the concept of a smart city
00:05
HD
The quality manager engineer checks the constructed metalwork object for compliance with the 3D model in the tablet.
00:09
HD
Architect Analyzing Holographic Smart Building Model with Glowing Data Connections Representing Futuristic Construction Technology
00:10
HD
Detailed BIM model of a modern metro station and transport hub with architectural elements
00:05
HD
An architect or urban planner presents a digital blueprint for a new residential development, using CAD or BIM software on a large interactive screen to review zoning and floor plans.
00:15
HD
Connected BIM. Businessman Working in Office among Skyscrapers. Hologram Concept
00:36
HD
Mock-up Engineering Architectural Design Software. CAD  Building Model with Overlay Graphics Animate Hvac, Duct, andMep Routes, Showcasing Advanced Bim Virtual Construction Planning
00:21
HD
Furnishing items are virtually arranged in an empty room and make up a living room with armchairs and sofas, building information modeling, BIM, 3d rendering, 3d illustration
00:14
HD
Professional architect manipulating a 3d model of a house on a tablet, using cad software, exploring different design options and perspectives
00:07
HD
4K resolution slow motion, Asian female architect or engineer designer working with blueprint planning on workplace. Architect woman working in office.
00:08
HD