設定密碼的連結已經傳送至: 日後若要存取您的購買項目,您將需要使用密碼。
免費試用即可取得 3 部影片或 25 張影像
免費試用即可取得 3 部影片或 25 張影像
已新增篩選器
排序方式:

在影片中找到 6,524 個「drafting tools」的結果

mathematics tools of rulers, eraser, pencil, cutter video footage
00:16
HD
Two young women of different ethnicities are engaged in a discussion about sewing patterns. They explore designs and techniques in a sewing studio filled with colorful fabrics and tools
00:10
HD
Focused business professional drafting partnership contracts on a sleek laptop emphasizing clarity and legal compliance.
00:06
HD
Architects discussing apartment building blueprint at office desk, using drafting tools for new architectural project design. Architecture and business concept
00:14
HD
Engineering team collaborating on architectural blueprints, reviewing construction plans, and discussing building design concepts with tools and safety hard hat on table
00:13
HD
Camera side slide shows an assortment of classic manual drafting tools resting on a desktop covered with technical blueprint sheets. Perfect for engineering, real estate, and design context.
00:08
HD
Blurred person working on a laptop beside a city model and drafting tools on a desk, showing urban planning and design work
00:07
HD
Construction Blueprint: Close-up of a construction blueprint with drafting tools and two engineers in the background.
00:05
HD
Overhead view shows bearded man with glasses adjusting large white sheet across transparent desk beside drafting tools in dim workspace, under strong spotlight with deep shadows and glossy reflections
00:10
HD
A person arranges miniature buildings and trees on a design plan in a studio dedicated to urban planning. The atmosphere is creative, with architectural tools and materials visible
00:27
HD
Architectural blueprint with drafting tools animation
00:15
HD
Interface animation showing a coding assistant drafting defensive software code, with terminal validating security policy checks and passing tests below.
00:14
HD
Drawing for work
00:07
HD
Empty agency with PC monitor showcasing blueprint drafting and 3D modeling software on screen. Digital program emphasizes creative floor plan visualization for layout in a office environment.
00:15
HD
glowing neon Crossed pencil and ruler icon isolated on black background. representing design, architecture, measurement tools drafting design and geometry. 4k video animation.
00:10
HD
Architect designing building plans at night, working overtime on a new construction project with tools and blueprints.
00:07
HD
Closeup of architect hands drafting detailed technical building plans with markers, ruler, and drawing tools on large sheet of paper at creative workspace
00:26
HD
A dynamic clip showcasing engineering tools like calipers, ball bearings, and a pencil on a blueprint with technical drawings, capturing a detailed and precise view of mechanical design
00:14
HD
Engineers engage in a detailed analysis of aerospace designs, showcasing teamwork and innovative thinking as they collaborate on complex technical drawings and models. SACTR
00:14
HD
An architect drafts a residential floor plan at a desk with a miniature house model, blueprints, and design tools in a modern workspace.
00:15
HD
Colleagues collaborating on detailed blueprint in a modern office space, People working together on blueprint in a modern office
00:10
HD
A collection of simple geometric tools for math and drafting illustrations
00:10
HD
Team collaborating on targeted email campaign development with multiple screens displaying analytics brainstorming ideas and drafting messages.
00:06
HD
Architects discussing apartment building blueprint at office desk, using drafting tools for new architectural project design. Architecture and business concept
00:14
HD
Engineer working on architectural blueprints and plans, typing on a laptop with a compass, ruler, safety helmet, glasses, and a building model on the desk
00:15
HD
Engineer carefully measures and refines a technical blueprint with professional drafting tools in a low-lit studio, emphasizing precision, innovation, and the engineering design process.
00:39
HD
An artistic scene showcasing drafting tools on a wooden workspace in warm lighting, perfect for creative projects.
00:08
HD
Architectural drafting tools with a pencil and compass on a blueprint plan.
00:06
HD
Architect Reviewing Construction Plans at Sunset with Cranes
00:05
HD
Creative design and artistic inspiration concept watercolor paint set with drafting compass and wooden geometric shapes on a rustic wooden desk
00:06
HD
Landscape architecture planning with miniature model and blueprint
00:05
HD
Two people reviewing a house model, blueprint and tools at a desk during an architecture meeting, with laptop, hard hat and plan papers.
00:13
HD
Multicultural engineering and design team collaborating on architectural development project with digital drafting tools and computer workstations
00:25
HD
Architectural Design Visualization: An architect meticulously designs a modern urban landscape using advanced digital tools, representing innovation and precision in building design.
00:10
HD
glowing neon Crossed pencil and ruler icon isolated on black background. representing design, architecture, measurement tools drafting design and geometry. 4k video animation.
00:10
HD
Female architect working late at night, drafting blueprints and engineering plans in a dark office. Business and architect people concept
00:08
HD
miniature wooden house model on blueprint, warm workshop lighting highlights snow-dusted roof and detailed shingles, scale tools and drafting papers surround
00:10
HD
Glowing neon cyan icon of a vertical pencil with an eraser top positioned beside a measuring ruler against a black background. Animated graphic design tools icon, wireframe layout editor.
00:10
HD
Architectural drafting tools and blueprint icon on black background
00:06
HD
Architect in Plaid Vest Standing at Desk with Blueprints and Drafting Tools
00:45
HD
Measurement tools white line animation. Set square and moving straight ruler animated icon. Architectural drafting instruments. Isolated element on dark background. Alpha transparent video
00:09
HD
Architect reviewing a house floor plan on a laptop at a desk with model homes, drafting tools and a coffee cup.
00:16
HD
Architects discussing apartment building blueprint at office desk, using drafting tools for new architectural project design. Architecture and business concept
00:14
HD
Engineering team collaborating on architectural blueprints, reviewing construction plans, and discussing building design concepts with tools and safety hard hat on table
00:13
HD
Hands reveal a refined set of drafting tools in a velvet box, conveying precision, craftsmanship, and focused design work. Ideal for architecture, engineering, and creative process storytelling.
00:32
HD
Closeup medium shot of a civil engineer drafting detailed architectural plans for urban infrastructure using advanced CAD tools.
00:06
HD
Minimal creative workspace scene with geometric drafting tools and a modern pastel interface design.
00:13
HD
Architectural scale model catches shifting prismatic light as camera glides above white drafting table, surrounded by blueprints, rolled plans, pencils, and layout tools
00:05
HD
Education and academic planning concept notebook with stationery and drafting tools on a wooden desk overhead view of school supplies for study
00:06
HD
Industrial engineering blueprints with mechanical bearings and precision tools motion clip.
00:13
HD
Two construction workers measuring an architectural model with tools on a table in an office or studio
00:11
HD
Multicultural engineering and design team collaborating on architectural development project with digital drafting tools and computer workstations
00:16
HD
Architect working on house construction plans with blueprints, color samples, measuring tools and architectural drawings on a wooden desk.
00:18
HD
glowing neon Crossed pencil and ruler icon isolated on black background. representing design, architecture, measurement tools drafting design and geometry. 4k video animation.
00:10
HD
Architects and engineers collaborating on building blueprints using drawing tools at night, planning new projects.
00:08
HD
Architectural floor plan with interior design materials, color palette, fabric samples and drafting tools for home renovation project planning.
00:11
HD
Glowing neon white icon of a vertical pencil with an eraser top positioned beside a measuring ruler against a black background. Animated graphic design tools icon, wireframe layout editor.
00:10
HD
Gears and drafting tools on graph paper symbolizing engineering and innovation
00:10
HD
Focused tradesman drafting dimension lines with triangular scale ruler and pencil on timber board in rustic home studio authentic craftsmanship documentary b-roll
00:37
HD
Measurement tools line animation. Set square and moving straight ruler animated icon. Architectural drafting instruments. Outline element on white background. HD video with alpha channel
00:09
HD
Architects and engineers discuss house plans at a desk with a blue roof model, laptop, tools and documents in a modern office.
00:05
HD
Architects discussing apartment building blueprint at office desk, using drafting tools for new architectural project design. Architecture and business concept
00:07
HD
Engineering team collaborating on architectural blueprints, reviewing construction plans, and discussing building design concepts with tools and safety hard hat on table
00:12
HD
Medium shot of hands examining drafting tools in a fitted case, conveying careful inspection, quality control, and focused technical preparation.
00:07
HD
Geometric tools compass and triangle drawing a circle on a dark grid background concept
00:10
HD
Busy older adult craftswoman making blueprint on paper sheet developing technical sketch for glass project creating architectural drawings by hand with ruler and pencil at table in workshop studio
00:10
HD
Blueprints, technical architectural plan, engineering drafting tools, cad layout engineering cad layout
00:08
HD
Woman in safety vest holding wooden plank and typing on laptop amid tools and hardhat on table in studio; concentration.
00:14
HD
Vintage drafting tools and parchment on wooden table in warm sunlight. Architecture, engineering, design concept.
00:06
HD
Project blueprint title animation featuring floating 3d engineering tools and office stationery items on a dark blue background motion graphic
00:10
HD
Orange drafting tools including a compass and triangle ruler rotate smoothly in this minimalist digital animation video for technical projects
00:10
HD
Empty wooden chair near dusty desk, sunlit window casting long shadows across bench, scattered drafting tools and sketch papers, oil lamp and candle on shelf,
00:10
HD
designers reviewing plans, architect and writer finalize design, collaborative review of blueprint in bright workspace, team working together on architectural plans with tools and technology
00:09
HD
Architect developing blueprint for construction project, drafting building plan using ruler on desk with safety hard hat. Business and architect people concept
00:08
HD
 Top View of architectural Engineer Working on His Blueprints, Holding Tablet Computer, Using Desktop Computer Also. His Desk is Full of Useful Objects and Evening Sun.
00:11
HD
A dynamic team collaborates on an engineering project, engaging with technical drawings and using various drafting tools in a modern workspace environment. SACTR
00:19
HD
A person is meticulously working on a detailed miniature house model using various materials. The setting appears to be a workshop with drafting tools and blueprints.
00:10
HD
measuring tools for calipers. mechanical engineers, design drawings, mechanical engineering, mechanical engineering, engine manufacturing plant, industry, industrial works, blueprints.
00:05
HD
 An architect's ruler and set square rest geometrically on a large, blank blueprint paper The camera slowly glides over the tools from above, with subtle handheld motion Light shifts gent 4K
00:10
HD
Construction team reviews plans around a small house model, laptop and tools in a modern office, showing home design, building planning and teamwork.
00:06
HD
Architects discussing apartment building blueprint at office desk, using drafting tools for new architectural project design. Architecture and business concept
00:06
HD
Architect carefully drafting blueprint plans on a desk with a building model and laptop, designing civil engineering projects and urban development
00:18
HD
A focused design engineer uses traditional drafting tools to precisely measure technical schematics. Excellent for concepts of precision engineering, mathematics, and craftsmanship.
00:26
HD
Paper patterns laid out on a spacious cutting table showcasing precise measurements and drafting tools for creating a classic trench coat design.
00:05
HD
architect works in the office
00:17
HD
A glowing filament bulb shines over a blueprint surrounded by drafting tools and handwritten notes.
00:10
HD
Man holding a large rolled blueprint with hands, studying and reading plans amid ladders, boxes and tools in studio; concentration planning.
00:25
HD
Compass for drawing. Set of old different compasses. Retro metal compasses and drafting tools on a black background. Drawing pen. Tool for study draw
00:13
HD
Ink bottle and drafting tools on a sketch, sunlight casting shadows in a creative workspace
00:10
HD
Focused kid African American boy sitting at desk working on engineering project, child using drafting tools ruler and pencil doing geometry homework, while studying at home. Technical drawing for kids
00:08
HD
Close-up of female hands drawing on blueprint while architect is working at home using laptop. Contemporary activities and professions concept.
00:27
HD
Indian engineer designer drafting draw on a table in a bright room.
00:12
HD
Architect developing blueprint for construction project, drafting building plan using ruler on desk with safety hard hat. Business and architect people concept
00:07
HD
Technical drawing and tools
00:13
HD
Team members collaborate on engineering projects, analyzing blueprints and discussing technical details. The workspace includes laptops, safety gear, and drafting tools for effective planning. SACTR
00:14
HD
A construction helmet rests on blueprints with a ribbon, beside drafting tools and a grid background
00:08
HD