암호 설정을 위한 링크가 다음으로 전송됨: 나중에 구매 기능을 이용하려면 암호가 필요합니다.
무제한 다운로드와 강력한 AI 편집 기능으로 제약 없이 창작해 보세요
무제한 다운로드와 강력한 AI 편집 기능으로 제약 없이 창작해 보세요
새 필터 추가됨
정렬 기준

비디오에서 ..plum에 관한 50,442개 결과

Dual plumes of soft pink smoke rising continuously on black background
00:21
HD
White thick smoke on green screen background. Steady vapors- Realistic industrial pollution vapor animation. Sand dust swirling smoke rolling low. Thick plumes of burning run from left to right.
00:12
HD
Close-up of ripe plums with water droplets on the vine against a blurred background
00:08
HD
Tourists standing on dark ash rim of Mount Yasur volcano, looking down into active crater emitting large plumes of white smoke on Tanna Island, Vanuatu. Travel, explore, adventure. Aerial drone shot
00:12
HD
Dynamic white smoke and fog plumes expanding against a dark backdrop, perfect for overlays and effects.
00:08
HD
Black prunes or dried plums circle rotation close up
00:06
HD
Orange particle wave flowing on dark plum loop background
00:05
HD
Ripe plums fruits on a tree.
00:13
HD
Frost cinematic contrasting cryogenic plumes revealing luminous frozen particle dynamics
00:06
HD
Aerial view of the Litli-Hrutur volcanic eruption with glowing lava flows and thick smoke plumes rising over the landscape in Grindavik, Grindavikurbaer, Iceland.
00:22
HD
Close-up of three fresh dark purple plum fruits on a clean white studio surface, one plum cut open showing. Ai generated
00:10
HD
Ripe, juicy plums with fork and knife on a blue plate. Juicy plum cut in a half. Fruits and time of harvesting. Juicy plums sprinkled with water close up.
00:17
HD
Fireball explosion with alpha channel. Realistic fire blast isolated. Fiery explosion and smoke plumes
00:05
HD
Spring blooming plum blossoms cherry blossoms bees collecting nectar
00:16
HD
Dramatic slow motion shot of a plum plunging into water creating a splash with background lights
00:08
HD
Explore an advanced IT Service Management Dashboard showcasing incidents, service requests, SLA performance, and availability with a sleek dark plum design and vibrant analytics.
00:15
HD
Fresh cherry plums in a basket
00:05
HD
Top view of fresh ripe plums rotating on board. Harvest time. Healthy and organic fruit concept
00:22
HD
Deep blue ink blooming and swirling in clear water
00:05
HD
Panoramic studio scene shows pale blue delphinium cluster on slender green stems against deep black background while white ink plumes drift outward, creating delicate contrast, airy texture, and
00:30
HD
Spring flowers. Plum flowers  or apricot flowers on branch blossom on a pink background. Time lapse video.
00:15
HD
Fresh plums with water droplets on a rustic wooden surface
00:07
HD
Sapodilla fruit on the sapodilla tree plant , Sapodilla plum in the garden fruit .
00:11
HD
Billowing white vapor plumes gently rising with dark ambient lighting creating ethereal atmospheric effects
00:06
HD
Meandering Jet Stream Rossby Waves and Cut Off Lows on a Potential Vorticity Chart, Seamless Loop in subtle plum tones
00:10
HD
A Caucasian woman's hand selects ripe plums from a market stall, symbolizing harvest season and fresh produce
00:08
HD
plums in a basket, grapes, purple
00:10
HD
Spectacular volcano eruption under a vibrant night sky with lava flows and smoke plumes
00:08
HD
Aerial view of Drax Power Station, a tapestry of industrial prowess amidst verdant fields, with cooling towers releasing plumes into the sky, Selby, United Kingdom.
00:16
HD
Industrial factory complex showing towering distillation columns, smokestacks, and chemical processing units actively releasing thick plumes of smoke and gas into a hazy, polluted sky
00:05
HD
Power Plant Cooling Towers Release Massive Steam Plumes on a Bright Day
00:12
HD
Industrial Sunset Symphony: Towering smokestacks pierce the vibrant sunset sky, releasing plumes of white smoke that mingle with the warm hues of dawn or dusk.
00:05
HD
Beautiful ink plum blossom video
00:06
HD
Sunlit branches with ripening yellow plums. Lush orchard setting featuring sundrenched yellow plums and thriving greens
00:14
HD
Close tracking video of two men, rich mahogany skin with plum lipstick, light beige skin with lavender lipstick, kissing, lips with iridescent shimmer under soft diffused light. Concept of lgbtq
00:10
HD
White and Pink Flower Petal Explosion Video Background with Alpha Channel, Realistic Ume Plum Blossom Burst Animation Stock Video Overlay, Spring Wedding Celebration Japanese Style, 4K ProRes 4444
00:13
HD
Close-up of fresh plums on a farm. Growing plums. Agriculture
00:26
HD
Mount Yasur volcano actively erupting lava bombs and plumes of dark smoke into the night sky, showcasing the powerful forces of nature on Tanna Island, Vanuatu. Aerial top down view
00:12
HD
Wisps of smoke gracefully swirl and dance against a dark background
00:28
HD
Dark dried plums in bowl with fruit on white background
00:10
HD
Close-up of ripe purple plums hanging from a branch in a plum orchard, glistening with dew drops.
00:08
HD
Spring blooming plum blossoms cherry blossoms bees collecting nectar
00:16
HD
Juicy ripe plums on a branch in a plum orchard on a bright sunny day, harvesting.
00:05
HD
Red plum blossoms under a full moon
00:10
HD
Force Chains In A Jammed Disc Packing Sheared By Rough Walls, Stick Slip Seamless Loop in deep plum tones
00:10
HD
Single ripe plum with water droplets, evokes freshness and natural beauty, ideal for summer and harvest themes
00:10
HD
Three ripe purple plums hanging on a branch with green leaves, bathed in warm sunlight.
00:05
HD
Close-up of a broken moss-covered branch in a Moc Chau plum orchard, showing raw bark textures in warm summer sunlight with soft green bokeh in the background.
00:09
HD
beautiful cherry tree with tender flowers. seamless looping overlay 4k virtual video animation background
00:18
HD
beautiful and ripe plums on a white background.
00:10
HD
Pale blue delphinium floral spike oriented diagonally from left toward center is progressively enveloped by dense pale blue and white smoke or ink-in-water plumes entering from right
00:30
HD
Fresh plums are gathered with green leaves at a local market during the summer months in a small town
00:10
HD
Wet purple plum on the table, delicious fresh harvest of oval-shaped and purple-colored plums in drops of water
00:12
HD
Ripe red plums covered in water drops, presenting a fresh fruit heap
00:05
HD
Plum tree with ripe plums and sunlight. Fruits in an orchard garden ready for to be harvest.
00:26
HD
White realistic smoke clouds and vapor plumes rising on a green screen background
00:15
HD
a plum tree in autumn 4k video
00:15
HD
Industrial Nightscape: An industrial complex at night. Illuminated with bright lights, towering structures release plumes of smoke into the atmosphere, set against the backdrop of the darkened sky.
00:05
HD
a close up of a row of plum trees with purple fruit on them
00:05
HD
Closeup focused plum with smooth reflective skin isolated on black background controlled lighting rich color depth and sharp focus
00:10
HD
Blue plums on a branch
00:13
HD
Spring blooming plum blossoms cherry blossoms bees collecting nectar
00:15
HD
Freshly harvested homegrown organic plums rotating on turntable
00:17
HD
Foods products improving digestive health. Constipation relief food.
00:20
HD
Golden sand dune ripples flowing desert waves abstract motion background seamless loop in bright plum tones
00:10
HD
Ripe purple plums hanging on a sunlit tree branch in an orchard, ideal for agricultural themes, harvest season, and healthy eating concepts
00:07
HD
Fresh red and purple plums held in cupped hands. Close up of harvested ripe fruit, healthy organic produce, autumn harvest, natural food, garden fresh
00:11
HD
Pink Flower Petal Explosion Video Background with Alpha Channel, Realistic Ume Plum Blossom Burst Animation Stock Video Overlay, Romantic Spring Wedding Celebration, 4K ProRes 4444
00:13
HD
Realistic white smoke plumes and drifting steam clouds isolated on transparent background for cinematic vfx motion graphics and professional video design
00:07
HD
Closeup of woman enjoying dark chocolate with bold plum lips
00:10
HD
Ripe purple plums growing among dense green foliage in an orchard during harvest season. Organic fruit and fresh farm produce concept showing natural sustainable agriculture and abundance
00:05
HD
Sparkling White Stars Twinkling on a Dreamy Pink and Purple Gradient Abstract Background Graphic Design
00:10
HD
plum on a tree, plum in the garden, plum in summer.
00:21
HD
fresh plums isolated on white
00:14
HD
Traditional shrine hall surrounded by blooming plum trees
00:16
HD
Camera panning across a tree full of orange cherry plums
00:10
HD
Wispy white smoke plumes drifting across a dark void with subtle cinematic motion
00:05
HD
Fresh ripe plums filling a wooden crate in a green garden
00:14
HD
Golden reeds swaying in a steady breeze across a tranquil meadow, their feathery plumes shimmering in daylight and tracing the gentle motion of a softly windswept landscape.
00:21
HD
Close-up of a single ripe Java plum on a wooden surface.
00:08
HD
Cinematic close-up of colorful pigment plumes suspended in dark medium showing thick cyan and yellow masses peeling and thinning into translucent lace-like filaments
00:43
HD
Spring blooming plum blossoms cherry blossoms bees collecting nectar
00:15
HD
Soft dusty rose and plum watercolor on white paper, a 4K romantic background for titles and presentations
00:25
HD
Abstract smoke plumes twist and reform in muted tones
00:06
HD
Animated Gantt Chart Project Timeline With Filling Progress Bars and Dependency Arrows, Seamless Loop in deep plum tones
00:10
HD
Freshly Washed Juicy Purple Plums with Sparkling Water Droplets Falling in Dynamic Motion Against a Vibrant Dark Background Capturing Freshness and Healthy Eating
00:08
HD
Mysterious swirling smoke plumes illuminated by a dramatic theatrical spotlight create an atmospheric and evocative visual effect with ethereal wisps dancing in the concentrated light beam
00:05
HD
Slow Falling Small White and Pink Flower Petals Video Background with Alpha Channel, Realistic Ume Plum Blossom Animation Stock Video Overlay, Long Duration Calm Spring Wedding Atmosphere, 4K ProRes
00:51
HD
Aerial footage captures Volcán de Fuego erupting at dawn in Guatemala, with dramatic ash plumes rising into the colorful sky.
00:14
HD
Industrial Sunset Panorama: Towering industrial chimneys pierce the dramatic sunset sky, releasing plumes of smoke that paint the horizon with fiery hues.
00:05
HD
Close-up of ripe purple plums hanging from branches among green leaves in a summer orchard. Fresh organic fruit harvest and natural farm produce concept for healthy seasonal food
00:10
HD
An aerial view captures a devastating wildfire raging through a dense forest, sending plumes of smoke into the sky and leaving a trail of scorched earth.
00:08
HD
Realistic welding sparks with white smoke plumes on green screen for compositing
00:09
HD
Powerful multistage rocket liftoff captured in detail, blazing engines and billowing exhaust plumes illuminate a star-filled Milky Way backdrop as it ascends toward orbit.
00:09
HD
Ripe, juicy plums with fork and knife on a blue plate. Juicy plum cut in a half. Fruits and time of harvesting. Juicy plums sprinkled with water close up.
00:18
HD
Vertical white smoke plumes rising against a black background. 4K. Loop
00:10
HD
Red plum blossom time-lapse photography
00:12
HD
Aerial drone cinematic shot of industrial sugar production factory with silos chimney stacks smoke plumes in foggy winter Bury Saint Edmunds United Kingdom
00:21
HD
Marian plum fruit in plate, in studio Chiangmai Thailand
00:12
HD